From indoor gyms and multipurpose halls to outdoor fields and recreational complexes, we deliver fully equipped sports facilities.
The photographs are part of my personal documentation from projects I was involved in as an engineer during my previous professional experience.
Works were carried out on the installation of windows and facade elements in accordance with modern standards of energy efficiency and sound insulation. High-quality materials were used to ensure durability, aesthetic appeal, and optimal protection of the building from external influences.
During the rough construction phase, all main structural elements forming the building's load-bearing framework were completed. Quality materials and modern construction technologies were used to achieve maximum strength and precision.
The complete construction of the grandstands was carried out, including reinforced concrete elements, reinforcements, and finishing surfaces. The works were executed with special emphasis on stability, comfort, and user safety.
All layers of the floor structure were executed — from leveling and insulation to final finishing. Special attention was given to precision and the selection of materials that ensure long-lasting durability and aesthetic appeal of the space.
Ceiling and roof systems were executed according to modern standards of energy efficiency and design. The roof structure ensures stability and protection, while ceiling panels contribute to the aesthetic and functional refinement of the interior.
Gypsum works were performed with a focus on functionality, quality, and aesthetics. The materials used provide excellent sound and thermal insulation, along with a smooth finish ready for further decorative processing.